Pakistan DISCO Solar Sizing & ROI

Start with your load.Design for your reality.

Build an accurate preliminary solar plan using your real DISCO tariff (LESCO, FESCO, IESCO, MEPCO, K-Electric, GEPCO, PESCO), monthly bill, and roof area. Then let Skyland engineers validate every assumption on site.

Calculate My Savings
Pakistan DISCO Solar & ROI Calculator

Calculate Your Electricity Bill Savings

Live sizing calibrated for LESCO, FESCO, IESCO, GEPCO, MEPCO & K-Electric 2026 tariffs.

Effective: PKR 72/kWh
PKR
Quick Select:
80% of load
30% (Day Peak Only)70% (Standard Commercial)100% (Zero Grid Energy)
Recommended System
32 kWp79% Covered

Generates ~3,840 units per month (~46,080 kWh/yr)

Monthly Savings
PKR 207,360
Immediate bill reduction
Annual Savings
PKR 24.88 Lakh
Per year cash saved
Payback Period
~1.8 Years
Simple ROI horizon
25-Year Value
PKR 12.68 Crore
Lifecycle savings
Estimated Turnkey EPC Investment:PKR 25.60 Lakh – 31.36 Lakh
Roof area needed:~2,080 sq. ft.

NEPRA Net-Metering: Fully eligible for bi-directional 3-phase green net meter under NEPRA regulations.

CO₂ Offset: ~28.6 tons/yr🌳 ~1,287 trees planted

Preliminary estimate based on NEPRA grid standards and typical 4.0 PSH irradiance. Final design subject to site audit.

Prepare for the survey

Better information produces a better design.

You do not need every document before speaking with us. These inputs simply help the engineering team move from a rough estimate to a defensible system plan faster.

Explore the solar energy audit

Recent electricity bills

Ideally 12 months, including units, maximum demand, tariff, and billing history.

Operating profile

Shift timings, weekly schedule, seasonal production, and major daytime loads.

Roof and site information

Approximate usable area, roof type, access, shade, and structural documentation if available.

Electrical information

Transformer ratings, single-line diagram, generator setup, and interconnection points.

Solar electrical equipment

From screen to site

How the estimate becomes an engineered proposal.

01

Baseline the facility

We review bills, demand, shifts, site constraints, and your commercial priorities.

02

Survey the site

Our team validates roof geometry, electrical infrastructure, access, shade, and constructability.

03

Engineer the options

We compare system architecture, equipment, delivery model, and future expansion paths.

04

Issue a verified proposal

You receive a site-specific recommendation with defined assumptions, scope, and next steps.

Need backup or peak management too?

Solar sizing and battery sizing solve different problems. Skyland can model them together around your critical loads.

Explore energy backup

Want to see Skyland’s verified project work?

Explore Skyland’s named solar portfolio across multiple operating sectors.

View solar projects

Turn the preliminary plan into a site-specific design.

Share your bill and site details with Skyland Energy. Our engineers will validate the load, roof or land, electrical infrastructure, and practical delivery options.